Summary
Overview
Work History
Education
Skills
Accomplishments
Work Availability
Timeline
Generic
Benjamin A Adefila

Benjamin A Adefila

INSTALLATION ENGINEER
Lagos,Nigeria

Summary

To be skilled and competent telecoms professional in a technological world and to create a niche for my-self in this segment. Hardworking Installation Technician looking to new tackle new responsibilities and build upon skills in the telecom field. Outstanding analytical and perception abilities. Considered a valuable mentor to others. Pursuing a position where a technical background and a strong work ethic will be highly appreciated. Reliable Installer with 15years of experience in core installation roles. Lifts up to 5 pounds safely and effectively and follows directions to complete tasks accurately. Skilled core Installer knowledgeable about managing inventory, schedules and new installations. Familiar with quality standards and documentation requirements.

Overview

14
14
years of professional experience
11
11
years of post-secondary education
2
2
Languages

Work History

MTN COTONOU
02.2012
  • Republic of Benin)
  • HLR Expansion with 2 x GARP Boards 2 - Transportation of Equipment from Warehouse to Site (Cotonou) -Decommissioning of Bsc for MTN Benin
  • Installation of HLR and upgrading from monolithic
  • Trouble shooting of existing CCN installation, i.e
  • The connection of SS7 cable to the transmission
  • De-commission of BSC from the old switch and reinstall in the head office
  • Installation of all IN NODES

INSTALLATION ENGINEER

Laplace Technologies Limited
Douala Cameroon, Cameroon
06.2021 - 12.2021
  • Project Scope:

TECHNICAL SITE SURVEY

DEPLOYMENT OF NODE TO SITE

Manage the installation of node such CCN, SDP, OCC

Jumpstart the CCN and work remotely with other engineers via teamviewer

Dit the C-MODULE ____________________________________________________________________________________________

  • TopIngetra Cotonou
  • Benin Republic Dec 2017
  • Key Roles and Responsibilities:
  • Project Scope:

Managing the Installation of Huawei S7700 and S7706 Core Switch

Installation AAA series IPSERVERS

Installation of Huawei Power Rectifier

Did all the installation END to END

Secure Trusted Alliance

Lagos Nigeria March/April 2017

Key Roles, Responsibilities:

Project Scope:

Managing the Decommission of Core Node in MTN Switch Nigeria

Such Ericsson PGW, GGSN,CRS,BGW,VAS SERVERS, Huawei PCC, Hie 9200NSN

Core Implementation Manager CONTRACTOR

Standard Trusted Alliance
Lagos, Nigeria, Nigeria
03.2017 - 06.2021
  • Managing all the installation, decommission of Ericsson node in Lagos, and other sites in Nigeria
  • Project Scope:

Audit all is site materials

Give reports of the materials

TSS

Manage the Installation of core nodes and charging nodes for Ericsson in mtn data centers and switches in Port hacourt, Abuja, Owerri, LAGOS.Kaduna

Core Implementation Manager

Laplace Technologies Limited
DOUALA, Cameroon
02.2015 - 02.2016
  • Responsibilities: Installation Engineer
  • Project Scope:

Managing the Installation of MPBN (BLACK DIAMOND, Mounting and installing of extreme servers ‘firewall, SSG)

Installation of IN hardware’s such CCN, SDP, AIR, EMM

Installation of MGW in Bamenda

Installation of EVO BSC

EVO BSC Expansion Yaoundé and Garoua

Supervising the Installation of RNC, HSS, MGW, HLR

Core Implementation Manager

CleanIT Services/ Mpowered ENT, ERICSON CAMEROUN
douala, Cameroon
10.2013 - 11.2014
  • Key Roles and Responsibilities:
  • Project Location: MTN Cameroon
  • Project Scope:

Managing the Installation of MPBN (BLACK DIAMOND, Mounting and installing of extreme servers ‘firewall, SSG)

Supervising the upgrading of IN servers such, SDP, AIR, CCN

Connection of MPBN and SDP

Installation of MGW in Bamenda

EVO BSC Expansion Yaoundé and Garoua

Supervising the Installation of RNC,SBG, IPRAN MPBN

Supervise the installation of EPG, SGSN MKVIII

ERICSSON
08.2012 - 09.2013
  • Installation of all core node for mtn Cameroon ( EVO BSC, MGW, MSC BLADE CLUSTER,CUDB, PGW, HLR ETC)
  • Installation of all packet core ( CCN,CGSN )
  • Installation of charging system nodes( SDP, EIR, HXC, ECMS, AIR
  • Installation of charging MPBN and core MPBN
  • Updating of installation document
  • Supervising of all core nodes in all MTN switching center in the whole of Cameroon i.e MGW, EVO BSC, BLADE CLUSTER, CCN, GGSN, SGSN, SDP, AIR ECMS, SBG, RNC
  • Charging system with third parties hardware such as hp, extreme network, juniper, and CISCO under the platform of Ericsson.

Installation Technician / Supervisor

Free Energy Resources Limited Nigeria
10.2009 - 08.2013
  • Roject Location: ERICSON CAMEROUN (MTN) C.S 5
  • Roject Scope:
  • Installation of MPBN (Mounting and installing of extreme servers ‘firewall, SSG)
  • Upgrading Tsp/NSP 5.0 from mini to midi by installing base cabinet and connection of SS7, SIGTRANG
  • Cable from the micro cabinet to DDF rack and MPBN
  • Decommissioning of Midi TSP/NSP cabinet in Douala and install back in Yaoundé
  • Connection of MPBN and SDP
  • Installation of MGW in Bamenda
  • Installation of all core nodes in also the SDP
  • Trouble all installation on core node.

ERICSSON CAMEROON
04.2012 - 08.2012
  • Upgrading all BSC in Cameroon to VAMOS
  • Installation of NSP/TSP to be converting to CCN.

Installation Technician / Supervisor

Free Energy Resources Limited
01.2009 - 08.2009
  • Tele-communication implementation and Power Company) www.free-energy-group.com, Supervising the installation of core node such as MGW, TSP/NSP, MSC, BSC
  • Roject Location: MTN SWITCH ENUGU NIGERIA Project Scope:
  • Connecting and termination of Power from the equipment to distribution unit (DC UNIT)
  • Connection of optic fiber cable ET 155 to ODF
  • Connection of ET4 cable from equipment to DDF Rack
  • Connecting of E1 Cable to the transmission equipment on DDF rack
  • Decommissions of old AXE810 SWITCH Such as MSC

Installation Technician

Pivot Engineering Ltd
05.2002 - 03.2003
  • Pivot-GSM provide effective service for the identified rapidly growing GSM market in Nigeria and West Africa Region) www.pivot-engineering.com, Project Location: MTN & STACOMMS NIGERIA

Education

Technical Certification(s) -

TTC
04.2001 - 01.2012

Introduction to ss7 Signaling - undefined

TTC

Telecoms Project Management Course - undefined

Federal Polytechnic Ede

Diploma - Fittings and Machinist

National Board for Technical Education, NBTC

Senior Secondary School Certificate - undefined

West Africa Examination Council

Skills

Driving

undefined

Accomplishments

  • Did TSS (TECHINICAL SITE SURVERY) prior the implementing of SID(SITE INSTALLATION DOCUMENT)
  • Douala
  • Cable up DOBSC4 for VAMOS and GBoIP
  • Garoua
  • Install MGW Expansion HW for GAMGW1
  • Install VAMOS and GBoIP HW for GABSC1 & GABSC2
  • Yaoundé
  • Install YAMGW1 HW Expansion
  • Install YABSC5 VAMOS + GBoIP
  • Re-adjust the SID where there are red lines
  • Install SCB cards for two MGW (Kumba, Bafoussam)
  • Install BSC RPG HW for 4 BSC ( Douala , Garoua, Yaoundé )
  • Install GSS server (HP) for SGSN
  • Install RADIUS server ( Yaoundé )
  • Install IP MUX HW for 1 MGW (Bafoussam)
  • Verify GB over IP HW installation, Installation of BTS Radio transmission for MTN Nigeria
  • Electrical wiring of shelter for MTN network Nigeria
  • Earthling conducting for MTN BTS Station
  • Installation of shelter electrical for Starcomm Nigeria _____________________________________________________________________________________________________
  • Ay2003
  • Roject Location: ERICSON NIGERIA
  • Roject Scope:
  • Installation of MSC BYB501 Ericsson Equipment for MTN Network
  • Installation of BYB 801BSC, HLR, SCP.for MTN Nigeria
  • Upgrading of APZ 21233 to APZ 21240 for MTN Nigeria _________________________________________________________________
  • Arch2005
  • Roject Location: ERICSON NIGERIA
  • Roject Scope:
  • Installation of GPRS NODE i.e.CGSN for MTN Nigeria
  • Installation of Switching for Vmobile Nigeria
  • Installation and connection of Sun server Equipment of Vmobile Nigeria __________________________________________________________________________________
  • Ay 2006 – Aug 2006
  • Roject Location: ERICSON IVORY COAST (Atlantic Project)
  • Roject Scope:
  • Nstallation of switching equipment for Atlantic Cellular Ivory Coast I.e
  • MSC, RBS, BSC, HLR, MGW, CN SERVER, CGSN, GGSN
  • Connecting and termination of Power from the equipment to distribution unit
  • Connection of optic fiber cable ET 155 to ODF
  • Connection of ET4 cable from equipment to DD
  • Connecting of E1 Cable to the transmission equipment on DDF rack
  • Transmission all new equipment for the IN network VAS Billing SMS Prepay
  • Installation of Sun Servers Routers and HP equipment floor plan updates the building of a completely new network
  • Working with the customer to ensure all the work undertaken is to the required standards
  • Ept 2006 – Oct 2006
  • Roject Location: TELECEL BENIN REPUBLIC
  • Roject Scope:
  • BSC swapping expansion for Telecel Benin
  • Expansion of ET4-1 Cable swapping for BSC Benin
  • Running of Tie cables for swapping of Siemens to Ericsson BSC
  • Looping of E1 cables to existing Siemens DDF rack
  • Ct 2006 - Jan 2007
  • Roject Location: TELECEL NIAMEY, NIGER REBUBLIC
  • Roject Scope:
  • Swapping of Siemens BSC to Ericsson MSC, BSC, TSP/NSP
  • Installation of RBS 2206 for test BSC
  • IN Node installation
  • Deportation of RBS to site
  • Upgrading of BSC

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

INSTALLATION ENGINEER

Laplace Technologies Limited
06.2021 - 12.2021

Core Implementation Manager CONTRACTOR

Standard Trusted Alliance
03.2017 - 06.2021

Core Implementation Manager

Laplace Technologies Limited
02.2015 - 02.2016

Core Implementation Manager

CleanIT Services/ Mpowered ENT, ERICSON CAMEROUN
10.2013 - 11.2014

ERICSSON
08.2012 - 09.2013

ERICSSON CAMEROON
04.2012 - 08.2012

MTN COTONOU
02.2012

Installation Technician / Supervisor

Free Energy Resources Limited Nigeria
10.2009 - 08.2013

Installation Technician / Supervisor

Free Energy Resources Limited
01.2009 - 08.2009

Installation Technician

Pivot Engineering Ltd
05.2002 - 03.2003

Technical Certification(s) -

TTC
04.2001 - 01.2012

Introduction to ss7 Signaling - undefined

TTC

Telecoms Project Management Course - undefined

Federal Polytechnic Ede

Diploma - Fittings and Machinist

National Board for Technical Education, NBTC

Senior Secondary School Certificate - undefined

West Africa Examination Council
Benjamin A AdefilaINSTALLATION ENGINEER